Less CO² emmisions
The new high-bay warehouse makes it possible to largely centralize the distribution activities and the supply of raw materials. The logistics building has been built in the immediate vicinity of the production site and is connected to it via a bridge over the road. Via automatic transport conveyors in this bridge, the warehouse and the production halls are connected: the raw materials are brought from the warehouse to the production lines, as well as the finished products from the production to the warehouse. Thanks to this physical connection between the two sites, 25,000 truck journeys can now be saved. It is expected that a CO² reduction of 365 tons per year will be realized.